Understanding the pipeline report
What the Pipeline tab in Reports shows, how each figure is worked out, and who can see and export it.
What the Pipeline tab in Reports shows, how each figure is worked out, and who can see and export it.
The Pipeline tab shows how applications are spread across your hiring stages and how many have moved on from each one. Open it from Reports and choose Pipeline in the row of report tabs. It has four summary cards, a funnel and a stage-by-stage conversion list.
System Admins, HR users and Members can open it. Agency users cannot. System Admins see every job, HR users see the jobs in their permitted locations, and Members see only jobs where they are the hiring lead, on the job team or a named approver. If you have no visible jobs, the cards show zero and the funnel shows only a Hired bar.
The Date range control at the top right is the only filter that changes this tab. It is compared with the date each application was submitted, so the tab answers the question: of the people who applied in this period, where are they now? Without a chosen range it shows the last 12 months, and the start and end days are both included. The Department and Job filters from the Reports overview are ignored here, so you cannot narrow this tab to one job or department.
The four cards
- Total Entered is every application submitted in the period, whatever its status. Rejected, withdrawn and disqualified applications are all included.
- Currently Active is the applications still in progress in a stage, added up across all stages.
- Overall Conversion is hired applications divided by Total Entered, rounded to a whole percentage. Rejected and withdrawn applications stay in the bottom of the fraction, so this figure is lower than the share of live candidates who get hired.
- Total Rejected is applications with the status Rejected. The line underneath shows it as a percentage of Total Entered, for example "20% of all".
The cards do not have to add up to Total Entered. Withdrawn and disqualified applications appear only in Total Entered.
The Pipeline Funnel
The funnel has one bar per stage, in pipeline order, and a final bar for Hired. Each row shows two numbers. The number inside the bar is how many applications have reached that stage. The number to the right, such as "12 here", is how many are sitting in that stage right now.
Reached is the applications currently in that stage or any later stage, plus every hired application. Rejected and withdrawn applications are not counted in any bar. The bars are sized against the largest reached figure.
Because each job can have its own stages, the funnel combines every stage it finds across all the jobs you can see. Stages are listed by their own names, so a renamed stage shows its new name. Stages from different jobs are merged into one row only when the name and the stage type match. The stage types are Screening / shortlisting, Interview, Video interview, Assessment, Offer and Custom, and the type is shown in the export. A stage that was renamed on some jobs and not others appears as separate rows.
Stage Conversion
Below the funnel, each row compares one stage with the next, for example Screening to Interview. It shows a percentage, a bar and a "lost" count.
- The percentage is the reached figure of the next stage divided by the reached figure of this stage, rounded to a whole number.
- Lost is the reached figure of this stage minus the reached figure of the next. In practice this is the number of live applications still sitting in this stage, waiting to move on. It is not a count of people who dropped out, and rejected applications are not in it. Use Total Rejected for that.
The last row runs from your final stage to Hired.
Worked example
Say 100 applications were submitted in the period. Of these, 40 are in Screening, 20 in Interview, 5 in Offer, 10 are hired, 20 are rejected and 5 withdrew.
- Total Entered is 100, Currently Active is 65, Overall Conversion is 10%, and Total Rejected is 20 (20% of all).
- Reached is 15 for Offer (5 plus the 10 hired), 35 for Interview and 75 for Screening.
- Screening to Interview is 47%, with 40 lost. Interview to Offer is 43%, with 20 lost. Offer to Hired is 67%, with 5 lost.
A low percentage between two stages means many live candidates are waiting there, so it is a good place to look when a job feels stuck.
Exporting and group users
Select Export, then Export as CSV or Export as Excel. The file is named after the report and the day, for example pipeline-report-2026-09-30.csv. The message Report exported successfully appears when the download is ready. If it fails, you see Failed to export report. Please try again. Each user can export up to 10 times a minute.
- The funnel table has the columns Stage, Type, Reached and Current.
- The stage conversion table has From Stage, To Stage, Conversion Rate (%) and Lost. In the CSV it follows the funnel table under a "Stage Conversions" heading.
- The Excel file has the same two tables on separate sheets, plus a Summary sheet with Total Entered, Currently Active, Overall Conversion (%) and Total Rejected. The rejected percentage is not included, and the CSV has no summary.
If you have not picked a date range, the screen shows the last 12 months but the export covers all dates. Pick a range before exporting if you want the file to match the screen.
Users with group access see combined figures for the companies in their grant, and the company filter lets them choose one company or all of them. The four cards are calculated the same way. The funnel is simpler: each bar shows the number of live applications currently in that stage, with stages merged by name and type across companies, followed by Hired. There is no reached figure and no Stage Conversion list, and the export follows the same layout. If the tab shows Failed to load pipeline report. Please try again later., reload the page after a moment.